DECEMBER 18, 2003 WORK SESSION AND BOARD MEETING SUMMARY: Work Session: Possible Classroom and Core Facilities Project—Scope and Cost Estimates
 

WORK SESSION
"Successful Management of Enrollment Growth" is at the top of the Board's goal list, and that enrollment growth has driven careful study, over five months, of classroom and core space needs. The December 18 work session began with a brief restatement of the headlines of enrollment growth-a 73% increase from 1988 to 2003, with another 13% growth expected within the next ten years. Also noted at the outset of the meeting was a new set of data summarizing program growth since 1995, such as the six advanced placement courses which have been added at BHHS.

The Board then turned again to consider the need for classroom space driven by enrollment growth, in a work session with the support of architectural and construction management consultants, district administrators, the advisory committee, and members of

In This Issue.. 
 
12/18 Work Session: Re
Classroom/Core
Facilities Project
1&2
Business Agenda 2
Coming Attractions 2
Board Action Summary 3

the public. Draft Master Plans were reviewed, showing cost estimates which ranged from $37MM to $53MM.

Two Versions of Drafts
At a long series of earlier meetings, the Board had been reviewing drafts showing additions of classroom and core space at each of the four district schools; the Board looked again at those drafts (dated 11/18) and at new drafts showing reductions in possible scope at each of the four schools (dated 12/18). The Board had asked for the drafts showing possible reductions in scope out of sensitivity to the size of the possible project, and the size of the possible cost estimates. The changes from the 11/18 to 12/18 drafts were detailed in the meeting and in public documents available upon request, but the general theme of the reductions was the paring down of proposed additions of core space such as gymnasia or computer facilities. The December drafts, after reductions in core space, now focus for the most part on classroom space.

Cost Estimates
Estimates on these two versions of the plans, prepared by the construction management consultants and architects, ranged from $37MM for the reduced scope drawings of 12/18 to $47MM for the more inclusive November drawings. In addition, capital costs estimates for infrastructure upgrade such as roofing replacement ranged from $6,400,000 for the

Byram Hills 
School District
10 Tripp Lane
Armonk, N.Y. 10504
Tel: (914) 273-4082 
Fax: (914) 273-2516 

School Board
President:
Mr. Ira Schulman
Vice President:
Dr. Eve Rice
Members:
Ms. Amy Fenno
Ms. Wendy Gardner
Mr. John J. Grimes
Mr. Rick Kaplin
Ms. Gail Reese

Superintendent:
Mr. John A. Chambers

Deputy Superintendent for Curriculum and Personnel:
Dr. Jacquelyn L. Taylor

Assistant Superintendent for Business and Management Services:
Mr. Gregory Carlson

Website:
www.byramhills.org

Board meetings on
Cablevision,
Channel 18-Thursdays & Fridays, 11 a.m. to 2:00 p.m.

 
1

 

©2009 Byram Hills Central School District
Armonk, NY
Contact Webmasters